Hermestav1.2 mock
Search… ⌘K
Building & Engineering

Inspection regimen & log

12 active routines · 42 preventive tasks due today · 7 overdue.

Due today
42
Daily + weekly cycle
Overdue
7
Action required
+2 vs week
Coverage 30d
94%
Completed vs scheduled
Failed audits 90d
0
All passes / pass-with-notes

Due today / overdue

RoutineSystemCadenceOwnerLast doneNext due

Upcoming this month

RoutineCadenceProcedureRegulatory basisNext
Pool chemistry · pH/ORP/free CldailySample 3 stations, log to BMS, dose if out of band.ME Sanitary code §14.22026-04-18
Fire detection walk-throughweeklyActivate 1 detector per zone, verify panel + remote alarm.EN 542026-04-19
Cold-water tank inspectionweeklyFree chlorine + visual sediment check.2026-04-19
Generator weekly test runweekly30-min loaded run · log frequency, voltage, fuel.2026-04-20
BMS device health auditweeklyCoverage report, missing devices triage.2026-04-22
Kitchen hood grease auditquarterlyVisual + ATP swab; schedule deep clean if grade <B.NFPA 962026-04-22
Elevator C · annual statutoryannualVendor visit (Schindler) · brake test, governor, ropes.EN 81-202026-04-22
Hyperbaric chamber safety auditmonthlySeal integrity, pressure decay, O₂ analyser.ASME PVHO-12026-04-30

Recent completions

WhenRoutineByOutcomeFindings
2026-04-17 07:00Pool chemistry · pH/ORP/free ClGoran PetrovicpasspH 7.6 (band) · free Cl 1.2 mg/L · ORP 720 mV.
2026-04-15 14:20BMS device health auditVeljko Spasojevicpass with notes1 leak sensor on D-7 stack offline — replaced (rtn.D704 incident).
2026-04-13 06:00Generator weekly test runBojan ZivkovicpassLoaded run 30 min · 49.97 Hz · fuel @ 92%.
2026-04-12 10:00Fire detection walk-throughNemanja LukicpassAll zones cleared in 47 min.
2026-04-12 09:15Cold-water tank inspectionGoran PetrovicpassFree Cl 0.42 mg/L · no sediment.
2026-04-10 13:00Spa fan-coil drain pan checkDragan Ilicpass with notesFC-02 setpoint deviation flagged · raised WO.
2026-04-04 08:30VRF filter rotation · floors 2–4Dragan Ilicpass with notesAHU-3 (B-floor 4) filter EOL · replaced.
2026-03-30 11:00Hyperbaric chamber safety auditNemanja LukicpassPressure decay <0.5% / 30 min · O₂ analyser calibrated.
2026-02-14 09:00Dry riser hydrostatic testNemanja Lukicpass12 bar held for 60 min · no drop.
2026-01-08 15:00MV switchgear thermographyBojan ZivkovicpassAll panels within 10°C delta. No anomalies.