Hermestav1.2 mock
Search… ⌘K
Building & Engineering

Command center

One operational view across 12 levels · 154 hotel rooms · 136 residences. Engineering shift live, day 2026-04-17.

Run daily walkthrough
Operational monitoring surface. Certified life-safety and plant systems remain the source of physical control.
Building health
92 / 100
SLA 91% · 4/4 elevators
+1 vs 7d
Critical alerts
3
14 owner requests open
-2 DoD
Open work orders
86
0 due today · 0 overdue
Blocked inventory
6 + 2
6 hotel · 2 residences
+1 today

Building stack

Digital twin →

Critical alerts

Open inbox →

Work order queue

All work orders →
IDTitleAssigneePriority · SLAStatus
WO-4181D-0704 · leak source repair + dry-outMarko Petrovic15 min · P1in progress
WO-4180Spa HVAC FC-02 · fan-coil replacementDragan Ilic2 h · P2scheduled
WO-4176Elevator C · annual statutory inspectionvendor · Schindler2 h · P2scheduled
WO-4174Garage exhaust fan 04 · vibration diagnosisDragan Ilic2 h · P2in progress
WO-4168Kitchen hood quarterly grease auditvendor · Halton2 h · P2scheduled
WO-4165D-802 · elevator vibration assessmentNemanja Lukic2 h · P2in progress

Preventive maintenance · today

Due today42
Overdue inspections7
Open inspections

Owner-sensitive items

AI engineering copilot

AI alert

D704 leak detected overnight — tech assigned, arrival at 09:10 held.

The ceiling sensor in D704 flagged water ingress at 04:12. Assignment went to Marko (plumbing) at 04:24. Incoming guest (1 room, 2 nights) rebooked to D706; D704 is blocked until walk-through.

AI insight

1BR|Sea occupancy running 6 pts above plan through the quarter.

Sold nights in the 1BR|Sea pool are tracking 60.9% vs a 55% plan. Owner allocations will settle ~4% above forecast if the trend holds — flag for Q3 statement narrative.

AI action

Elena Markovic requested Q3 statement preview — 2 days early.

Founder-tier owner; previewing the statement (draft) would be consistent with last quarter's handling. No published rule blocks early preview.

Priority focus · D-0704

Auto-shut-off triggered 04:12. Owner arrival 17 Apr 15:20.

Resolve before 14:00 to avoid owner-relations escalation. Marko on-site, source isolated, dry-out begun.

leak sensorowner arrivalWO-4181D-0704
Technician mobile preview
Field crew sees the same checklists, work orders and alerts on phone.
Open mobile preview